Norway’s first advanced plastic-sorting facility

Norway’s first advanced plastic-sorting facility

SEKO Elektro delivered the complete electrical installation for TPRF—one of Europe’s most advanced facilities for sorting plastic packaging.

The TOMRA Plastretur Recovery Facility in Vestby marks an important step forward for materials recycling in Norway. The facility was designed to sort plastic packaging with high precision and capacity, enabling more plastic to be recycled domestically. SEKO Elektro was responsible for the complete electrical delivery to this technically advanced facility.

About the project

TPRF represents an investment of approximately NOK 600 million and is Norway’s first facility for the advanced sorting of plastic packaging. The aim is to establish national infrastructure that enables significantly more plastic to be recycled in Norway while reducing the need for transportation abroad.
SEKO Elektro delivered the facility’s complete electrical infrastructure and helped make one of Europe’s most advanced plastic-sorting facilities a reality.

The facility was designed for reliable and energy-efficient operation, with integrated monitoring and control systems supporting precise and stable production over time.

The delivery

  • Complete electrical installation
  • Power installations
  • Lighting
  • Data networks
  • Cabling
  • Technical installations

The results

  • Investment of approximately NOK 600 million
  • Capacity of up to 90,000 tonnes of plastic annually
  • Fully automated sorting into ten plastic fractions
  • Norway’s first advanced plastic-sorting facility
  • One of Europe’s most modern sorting facilities
  • An important contribution to increased materials recycling and the circular economy

New technology for the green transition

Previously, around 98% of Norwegian plastic packaging was transported to Germany for advanced sorting. The establishment of TPRF allows a far greater share of this sorting to take place in Norway.
The facility uses advanced technology to sort large volumes of plastic with high precision. This enables better resource utilisation, reduced transportation and greater opportunities for materials recycling.

SEKO Elektro delivered the complete electrical installation and helped establish the technical infrastructure required for the automated production process.

Coordinating multiple technical disciplines

TPRF is a complex industrial project involving numerous technical interfaces and international suppliers. Close coordination between all disciplines throughout the project was essential to maintaining efficient progress and high quality.

Projects of this kind place significant demands on planning, documentation and communication. A structured delivery model was crucial to ensuring that all technical installations worked seamlessly together when the facility became operational.

A complex industrial project

One of Europe’s most advanced facilities for sorting plastic packaging.

International collaboration

Coordination between multiple technical disciplines and international suppliers.

Technology for a circular economy

Advanced technology enables increased materials recycling and reduces the transportation of plastic.

Precision through international collaboration

Regular, focused coordination meetings led by Devoteam and Sutco ensured the seamless integration of the processing equipment. Clearly defined interfaces, structured project management and close collaboration between everyone involved were essential to progress and quality throughout the project.
“This was a complex facility with numerous interfaces, requiring structure and a complete overview. SEKO Elektro was a reliable partner throughout the entire project.”

Sondre Helgesen. Managing Director, Thermica AS

A technical milestone

The TOMRA Plastretur Recovery Facility is one of Norway’s most important materials-recycling projects. The building itself was relatively straightforward, but the project was technically complex, with extensive interfaces involving the processing equipment.
The processing facility was supplied by German companies working with several subcontractors, different working methods and varying technical practices. This placed considerable demands on coordination, structure and close collaboration between everyone involved.

“This was a very different kind of project, with new parameters, extensive processing equipment and numerous external factors to manage. It placed high demands on planning, coordination and execution throughout the project. We are proud to have delivered the electrical installation for a facility that plays a key role in the green transition.”

Thomas Grotli. Project Manager, SEKO Elektro

Portrettbilde av Thomas Grotli

Technology enabling circular resource use

Through its complete electrical delivery, SEKO Elektro helped establish Norway’s first advanced sorting facility for plastic packaging. The project demonstrates how advanced electrical solutions provide the foundation for increased materials recycling, reduced transportation and more circular use of resources.

Make an inquiry