BREEAM expertise in practice

BREEAM expertise in practice

SEKO Elektro delivered the complete electrical installation for MEKO Group’s new central warehouse in Vestby – a highly automated logistics facility designed to achieve BREEAM-NOR v6.1 Very Good. The project demonstrates how years of experience from sustainable building projects have been developed into an established working method.

From experience to an established method

When Norway’s first BREEAM-certified warehouse and logistics building was constructed in 2017, SEKO Elektro was among the companies developing new working methods to meet the requirements for sustainability, documentation and collaboration.

Today, this expertise is an integral part of the company’s project delivery. MEKO Group’s new central warehouse in Vestby demonstrates how structured planning, early involvement and close collaboration contribute to energy-efficient buildings, high quality and predictable project execution.

About the project

MEKO Group has established a new, highly automated 32,000 m² central warehouse in Vestby to consolidate its goods handling operations in Norway. The facility was developed by Bulk Industrial Real Estate, with Thermica AS as the main contractor and SEKO Elektro as the main electrical contractor.
The building was designed to achieve BREEAM-NOR v6.1 Very Good and combines AutoStore technology, energy-efficient solutions and modern control systems. The project placed high demands on technical coordination, documentation and precision throughout the construction process.

Services delivered

SEKO Elektro had overall responsibility for the electrical installations and delivered:

  • Energy-efficient electrical installations
  • Materials selected in accordance with environmental requirements
  • Advanced control and metering systems
  • Robust ICT infrastructure
  • Standby and emergency power systems
  • Complete documentation in accordance with BREEAM-NOR v6.1

The project was delivered in close collaboration with Thermica AS and the client throughout the construction process.

Results

  • A highly automated logistics facility covering 32,000 m²
  • Designed to achieve BREEAM-NOR v6.1 Very Good
  • Energy-efficient and future-ready electrical solutions
  • Robust technical infrastructure supporting automated operation
  • Structured project delivery with high quality and predictability
  • A modern logistics facility designed for efficient operation and lower environmental impact
Portrettbilde av Thomas Grotli

From experience to an established method

Through several BREEAM projects, SEKO Elektro has developed a structured working method that supports high quality, efficient documentation and predictable project delivery.
“There was a great deal for us to learn. We had to understand both the requirements and how to document our work correctly to receive recognition for the measures implemented. Today, we have an established working method that provides structure, quality and predictability in BREEAM projects. Mekonomen Vestby is a good example of this.”
Thomas Grotli. Project Manager, SEKO Elektro

Early collaboration creates better projects

In modern logistics and industrial projects, the foundation for successful delivery is established during the planning phase. When objectives, responsibilities and documentation requirements are clarified early, collaboration between disciplines becomes more efficient and the risk of errors is reduced.
“When SEKO Elektro and the other technical disciplines are involved from the beginning, we know who is responsible for each task and when decisions must be made. This provides predictable progress all the way through to handover.”
Sondre Helgesen.Managing Director, Thermica AS

BREEAM is about more than environmental performance

BREEAM-NOR places extensive requirements on documentation, material selection, energy use and collaboration between disciplines. Establishing the strategy early makes it easier to plan appropriate solutions, reduce risk and deliver buildings with high quality, lower energy consumption and favourable life-cycle costs.
Experience shows that a structured working method improves project flow from engineering and documentation through to handover and operation.

BREEAM-NOR v6.1

Designed and documented in accordance with one of Norway’s leading environmental certification schemes for buildings.

32,000 m² logistics facility

Complete electrical installations for a highly automated central warehouse.

Structured collaboration

Early involvement and documented working processes support high quality and predictable project delivery.

An established delivery model

Through its experience from several BREEAM projects, SEKO Elektro has developed a working method that can create value for both the client and end users through:

  • Lower energy consumption and environmental impact
  • Improved indoor climate and working environment
  • Fewer operational disruptions and lower life-cycle costs
  • Predictable progress and high quality throughout the project

“We now have confidence in the process and can see the value it creates for the environment, the client and the end user.”

Thomas Grotli
Project Manager, SEKO Elektro

Expertise that creates better buildings

Through complete electrical installations, a structured BREEAM methodology and close collaboration, SEKO Elektro has contributed to the development of one of Norway’s most modern logistics facilities.
The project demonstrates how experience, documentation and technical precision can create energy-efficient buildings with high quality and lasting value.

Make an inquiry