Long-term modernisation

Long-term modernisation

Team Installasjon has modernised the lighting at Kirkeparken Upper Secondary School in Moss through energy-efficient LED solutions, DALI and KNX control, and the intelligent reuse of existing infrastructure.

Kirkeparken Upper Secondary School is one of the largest schools in Østfold, comprising approximately 22,000 m² and more than 4,000 luminaires. Through phased modernisation, Team Installasjon has helped reduce energy consumption, improve lighting conditions and enable more sustainable operation – while retaining and upgrading existing technical installations wherever possible.

About the project

Kirkeparken Upper Secondary School is being modernised through continuous upgrades rather than extensive replacement of entire systems. Team Installasjon has installed new LED luminaires with DALI and KNX control and upgraded existing installations wherever this has been technically and financially appropriate.
The project demonstrates how public buildings can be modernised step by step, with an emphasis on energy efficiency, sustainability and long-term value creation.

Project scope

  • 22,000 m² school building
  • More than 4,000 luminaires
  • LED lighting
  • DALI and KNX control
  • Reuse of existing infrastructure

Results

  • 22,000 m² school building modernised
  • More than 4,000 luminaires upgraded
  • Lower energy consumption
  • Improved lighting conditions
  • Reduced maintenance requirements
  • Prepared for further digital control

Modernisation with a long-term perspective

Instead of replacing the entire electrical system, Team Installasjon has adopted an approach that retains and upgrades existing infrastructure wherever it still has a long remaining service life. New LED luminaires have been combined with DALI and KNX control, while existing cable routes and installations have been reused wherever possible.
This approach reduces costs, material consumption and disruption to the building while providing the school with modern lighting and a future-ready control system.

Reuse enables more sustainable upgrades

By further developing the existing KNX and DALI systems, Team Installasjon reduced the need for new installations while retaining large parts of the infrastructure.
New luminaires were selected to fit the existing mounting points. This reduced the need for additional building work and made the modernisation both faster and more cost-effective.

To elektrikere i et av fellesområdene ved Kirkeparken vgs, der belysning er levert av Team Installasjon.
I et av fellesområdene ved Kirkeparken vgs med ny elektro, der belysning er levert av Team Installasjon.

Robust and well maintained

“The control system at Kirkeparken is robust and well maintained, using KNX and DALI technology. To optimise the work, we have reused the existing infrastructure and electrical design wherever possible. We have also sought to minimise the need for work by other trades, such as carpenters and painters, by selecting luminaires that cover the marks left by the previous fittings on walls and ceilings.”
Vetle Paulsen
Project Manager, Team Installasjon

Better lighting with fewer luminaires

“The transition to LED has provided better lighting, fewer luminaires and lower costs.”

Geir Strand Larsen
Østfold County Council

 

Intelligent modernisation through reuse

“We reused the existing installations and selected solutions that minimise alterations to the building. The result is both intelligent and sustainable.”

Vetle Paulsen
Project Manager, Team Installasjon

Lampe ved Kirkeparken vgs, der belysning er levert av Team Installasjon.
I et av fellesområdene ved Kirkeparken vgs, der belysning er levert av Team Installasjon.

A modern school building with a smaller carbon footprint

Through LED lighting, intelligent control systems and the reuse of existing installations, Team Installasjon has contributed to an energy-efficient and sustainable modernisation of Kirkeparken Upper Secondary School.
The project demonstrates how public buildings can be upgraded gradually, with careful consideration of financial value, environmental impact and future operation.